Every number below is measured off this build, cited to docs/phase-log.md, not a projection or a vendor benchmark. The design rewards spinning hosts up and down rather than holding static capacity.

Elasticity in minutes, not procurement cycles

Measurement Result

OpenShift IPI install, end to end

44m35s

Bare-metal MachineSet node to Ready

~20 min

HyperConverged convergence

~5 min

First test VM, create to Running

18 seconds

Windows compute-VM clone-to-Running (reclone, image + join fixed)

~2-3 minutes

All figures: docs/phase-log.md, 2026-07-09 "Phase 1 EXIT CRITERIA MET" and 2026-07-10 entries. What used to be a hardware procurement cycle is now a golden-image clone.

Burst economics favor high VM churn

The metal worker pool is the fixed cost — baseline ~$5.2/hr for this build’s cluster, including one m5zn.metal node. Scaling that MachineSet to 0 saves ~$4/hr and re-provisions in ~20 min. Windows compute VMs on top of already-paid metal are near-zero marginal infrastructure cost, so the design rewards spinning hosts up and down rather than holding static capacity for a peak that is rarely sustained — the opposite of the static-capacity problem this replaces (see The problem).

One platform team for containers and VMs

GitOps reconciles both estates through the same Argo CD app-of-apps model already used for containerized workloads elsewhere in the org. See GitOps for the app-of-apps layout.

Exit from hypervisor licensing volatility

No dependency on VMware’s post-Broadcom subscription-only pricing — see the vSphere row in The solution's comparison matrix. This design’s cost floor is a metal instance class (~$4/hr+), not a renewal negotiation.

Auditable supportability

One documented custom component instead of a fork or a repackaging of Symphony itself — the claim the whole design is built to defend. See the supportability spine in The solution.